Per the specifications provided by the designing engineer of Buyers Protection Group, Hughes Construction completed the following work on this Finnytown home.

  • Installed 15 steel pilasters
  • Installed one 3″ adjustable steel column on top of a new 12″x 12″ footer that was 4″ above garage floor
  • Excavated along foundation and sealed walls with HLM 5000 and capped with dimple board to facilitate drainage
  • Installed two new schedule 40 drain lines which were day-lighted to the street

Once the drainage system was completed, soil was replaced and compacted to minimize settlement.