For this particular project, multiple buildings on the property were in need of stabilization due to structural deficiencies.

For the 1st building, Hughes Construction Company installed new steel beams to replace the existing failing wood beams to stabilize the structure.

 

On the 2nd building we installed 30 steel angles and attached steel cross bracing as needed throughout the crawl space.  Additionally we installed 16 laminated veneer lumber beams (LVL’s)  alongside the existing floor joists.

*All repairs for this project were made based on the reports and designs provided by Cole Engineering Solutions.