During a remodel this building owner wanted to create more usable space. Hughes Construction was contacted and we decided to fill in an old boiler pad level with the rest of the basement, which in turn created more usable floor space. We ended up using about six yards of concrete which had to be pumped into the basement in order to get it there in a timely manner. Buckeye Concrete pumping provided the trailer mounted pump and Ernst provided the concrete for the project.