Hughes Construction installed 125 ft. of 4″ schedule 40 draintile, as well as an additional 150 ft.of solid 4″ drainage line that were both daylighted towards the left side of the yard, into the woods. Once both drainage lines were installed, we then covered the lines with 1″ drainage gravel. The additional soil that was left over from the excavation was relocated around a tree that had exposed roots.