Hughes Construction company excavated a trench leading from the rear patio along the right side of the home down to the city street. New 4″ schedule 40 draintile and downspout lines were installed and covered in 1″ of drainage gravel.  The gravel installed allows surface water to enter the draintile then be discharge into the street away from the property. After gravel was in place it was then covered in filter fabric and capped off with top soil.