Picture

During a home inspection Buyers Protection Group discovered cracks on the foundation walls inside the garage as well as on a wing wall, outside.  Hughes Construction Company was contracted to inject all the cracks using structural epoxy.  The wing wall required Hughes Construction to excavate before injecting the crack.  Our injection material was provided by Prime Resins.  The excavation equipment was provided by Art’s Tool Rental.