Hughes Construction was hired to inject over 100 lineal feet of foundation cracks and seal the foundation on the outside where the steel beams sit in the wall. First we prep all the walls for injection and then inject the cracks that are leaking water to take care of them. The rest of the cracks received structural epoxy injections, all with materials provided by Prime Resins. Due to the cracks running behind the old concrete laundry tub the homeowner elected to have it removed and replaced with a new plastic tub. To seal the 2 beam pockets, we had to dig down on the outside of the foundation and seal the area where the beam sits and then back fill the holes.