Hughes Construction was hired to install steel angles around the entire perimeter of the house to keep the foundation walls from moving, and also to inject the foundation wall cracks that had formed. The material for the injections was provided by Prime Resins. Hughes Construction also hung drywall in the finished parts of the basement to hide the
steel angles that were installed.