Picture

This homeowner had multiple foundation cracks around the side and back of the house, and hired Michael Montgomery from Buyers Protection Group to conduct an inspection.  The foundation and cracks were exposed due to the grade of the yard.  Hughes Construction was contracted to inject twenty four lineal feet of foundation crack with structural epoxy, including stapling each crack with steel reinforcement.  On the back right corner of the house, we had to cut out eleven sections and drill holes to insert hooked rebar into the wall.  Since the foundation was exposed we could inject from the outside and just seal up the inside of the cracks. Once the cracks were sealed on both sides of the wall we injected with structural epoxy materials provided by Prime Resins.