Hughes Construction Company excavated the front foundation wall as well as the left foundation wall to the depth of the footer. A trench was excavated to the rear of the property near an existing drain line. Once excavation was complete the exposed foundation wall was coated with a waterproofing material. A new 4″ drain line was installed at the bottom of the excavated trench and then was back filled with 24″ of 1″ drainage gravel. soil was replaced in compacted lifts to minimize settlement and all effected grass areas received seed and straw.