Hughes Construction removed an existing front porch and installed grade beams/piers per the plans of Buyers Protection group. Once all piers were put into place the side porch was lifted back into its original position. After all foundations were installed, flat concrete was replaced to its existing dimensions with 5″ of fiber reinforced class c concrete. All effected grass surfaces then received seed and straw.