Hughes Construction was hired to repair this failing foundation with steel pilasters, angles, and epoxy injections. The horizontal type cracks shown on this foundation are the reason steel pilasters were utilized and angles were installed on other walls that did not have the horizontal type cracks but still experienced movement. The cracks were injected with structural epoxy to bond the cracks back together and prevent future movement.