Hughes Construction Company removed an existing front porch, excavated the left, right, and front foundation walls down to the depth of the footer. The exterior foundation walls were coated with a water proofing material and capped with dimple board to facilitate drainage.  A new drain line was ran along the footer, connected to all window wells and daylighted at the rear of the property. An additional solid line was ran at the same time and connected to all downspouts in the excavated area. All drainage areas received a minimum of 24″ of 1″ drainage gravel. Steel pilasters and a concrete floor were installed per specifications of Cole Engineering Solutions.