Hughes Construction Company was contracted to install thirteen steel pilasters on the foundation walls per specifications provided by the designing engineer of Buyer Protection Group. The concrete floor was patched to match surrounding surface once the pilasters were installed. This block foundation had several cracks that showed up on the inside of the foundation wall, which were ground out and re-tuck pointed as a part of this repair.